Showing posts with label TSP. Show all posts
Showing posts with label TSP. Show all posts

Wednesday, May 30, 2007

Halfway to Last Year, a Month Early!

Ok, so when I ride home tonight, I'll break 1,500 miles for the year. Last year, I rode 3,022 miles. To match that, I'd need to ride 1,511 miles by June 30th. Today is May 30th. Hey, not bad! Well, unless you compare it to my goal for this year, and then I suck. ;-)


The goal for this year is 5,800 miles. I'm currently about 670 miles behind where I should be to meet my goal. I need to start putting on some serious mileage if I want to meet it. To be honest, though, I'll be perfectly happy with anything over 4,000 miles, and at my current rate, I should end up with 3,600 for the year - so I only need to put out 10% more effort than I have so far to break that 4,000 mark.


Last night I led a Bike Boulevard ride around Milwaukie. There was a lot of interest at the last TSP bicycle workshop about the concept of Bike Boulevards, which Portland has successfully implemented, and the BTA is pushing heavily for. Milwaukie really doesn't have a lot of good candidate roads, but last night we rode three of the best ones - Monroe, Stanley, and 29th. In each case, they provide a way across the city that parallels a much busier route. Monroe and Stanley are heavy secondary routes in their own right, and could really benefit from some traffic calming, or even a cul-de-sac / passthrough arrangement of some sort. The real question is how the local neighborhoods would feel about it. The ride itself went well, about 7 people showed up, including city planners Katie Mangle and Brett Kelver. The next TSP meeting is coming up soon - Saturday, June 2nd at 10am.


Back to the personal front, I averaged 11.9 mph on the way in to work today, which isn't bad. I'm riding on the new back wheel now - I replaced the old one on Monday. The old (original) back wheel is a stock Matrix 750 rim, and I'd broken 18 of 32 spokes over the last 18 months. Last Thursday, I sucked the chain into the rear wheel and bent (and in some cases gouged) the bottom of 12 spokes on the drivetrain side. I tightened a number of opposing spokes to make the wheel straight enough to ride home on (and feel pretty good about my emergency repair skills). So, away it goes, and the new wheel is mounted and ready to go. The spokes tinged a bit while adjusting, and it seems to be properly stressed in now.

So once again, I'm ready to ride!

Tuesday, May 08, 2007

Milwaukie TSP Bike / Ped Meeting #2


Saturday, May 5th was the 2nd bicycle / pedestrian workshop for the Milwaukie Transportation System Plan update. This workshop is part of a series of meetings hosted by the City of Milwaukie and facilitated by Jeanne Lawson Associates to allow the public unprecedented input into the planning and decision-making process regarding the future of Milwaukie's transportation network. DKS Associates, a national transportation planning firm, has been hired by the city to provide design and planning services to supplement and support the city's staff.


Brett Kelver opened the meeting with an overview of what the workshop is trying to accomplish - this was the second of two planned workshops. In the first workshop, the participants identified current conditions and identified a number of areas where improvements would be beneficial. The planners then took that information, and along with the original 1997 TSP they compiled a list of operational and capital projects to be listed in the new TSP. In this second meeting, the job of the participants was to prioritize those projects and provide feedback on anything that might be "missing".

Ryan Marquardt then reviewed the evaluation criteria for evaluating projects, which covered the following areas:
  • Connectivity - To transit, the Springwater Trail, activity centers (schools, parks, commercial areas), and neighborhoods. Also focusing on "filling in the gaps" in the existing pedways / bikeways.
  • Safety - Addresses locations with higher rates of pedestrian / bicycle accidents

  • Existing Facilities - Addresses facilities that are currently substandard or in need of repair.

  • Commuting - Improves or enhances commuting corridors.

  • Maintenance - How difficult will the project be to maintain?

  • Overall Scope - Determine whether it is a long-term or short-term solution, and how well the project connects / coincides with other jurisdictions.

Brett then went over the Operational Projects:
  1. Signage for the treatment plant trail (Kellogg Trail)
  2. Signange for the Springwater Corridor Trail
  3. Signage for Sparrow Street (Island Station neighborhood)
  4. Signage for neighborhood bike routes
  5. Re-striping projects (bike lanes)
  6. Sweeping out bike lanes
  7. Street-grate replacement (of existing badly-designed grates)
  8. Street-grate design
  9. Safe crossings for the Trolley Trail
  10. Milwaukie bike map
  11. Enforcement
  12. Education
  13. Multi-jurisdictional coordination

A lot of lively discussion ensued, mostly focused around items 3, 5, 11 and 12. The Island Station neighborhood was well-represented at the meeting, and it was determined that the issues facing cycling and River road on the hill up from and down to McLoughlin had concerns beyond simply signage, and that the project should be moved to the capital projects list. Ditto for the Trolley Trail. The participants generally agreed that the bike map that the City of Portland's Transportation Department put together was a great thing. (PDOT made a Milwaukie Bike Map thanks to a grant from Metro which covered extending the Smart Trips program to the Milwaukie portion of the Ardenwald / Johnson Creek neighborhood).

Additionally, "Encouragement" was added to the Operational Projects - programs involving community rides and other ways to encourage people to get out in the city on their bikes.


The discussion was followed by a vote. Each participant received a set of small circular labels (5 total) and was instructed to vote on the projects they thought were most important. Voting with more than 1 label per project was allowed.

After the voting was complete, it was evident that the participants overwhelmingly supported bike route signage, sweeping of bike lanes and education. Participants also supported (to a lesser extent) street-grate design, multi-jurisdiction coordination, the bike map (printing and distributing), signage for the trails and re-striping the existing lanes.

Alan Snook from DKS Associates then went over the capital projects, and introduced a map of the proposed changes to the bikeway system. Various points on the map were designated as capital projects, which were divided into Intersection Improvements, Bikeway Improvements, and Off-street Trail Improvements. Additionally, the 2 projects moved from the Operational Projects list were added, and during the course of discussion a few additional projects were also added. The final list that the participants voted on contained the following projects:

Intersection Improvements

A - Hwy 224 @ SE 17th Ave.
B - SE 17th Ave. @ SE McLoughlin Blvd. (99E)
C - SE Adams St. @ SE 21st Ave. (Railroad Crossing)
D - SE Johnson Creek Blvd. @ Springwater Trail
E - SE Johnson Creek Blvd. @ SE Linwood Ave.
F - SE Linwood Ave. @ SE King Rd.
G - SE Linwood Ave. @ SE Monroe St.
H - SE Linwood Ave. @ SE Harmony Rd.

Bikeway Improvements

I - SE 17th Ave. from SE Waverly Dr. to Harrison St.
J - SE Harrison St. from McLoughlin (99E) to SE 21st Ave.
K - SE Lake Rd. from SE Main St. to SE Guilford Dr.
L - SE Oatfield Rd. from SE Guilford Ct. to SE Lake Rd.
M - SE Harrison St. from Hwy 224 to SE 42nd Ave.
N - SE 37th Ave. from SE Harrison St. to Hwy 224.
O - SE Railroad Ave. from SE 37th Ave. to SE Linwood Ave.
P - SE 43rd Ave. from SE King Rd. to SE Filbert St.
Q - SE Linwood Ave. from SE Queen Rd. to SE Johnson Creek Blvd.
R - SE Linwood Ave. from SE Juniper St. to SE Harmony Rd.
S - SE Rusk Rd. from SE Lake Rd. to North Clackamas Park.

Off-street Trail Improvements

T - Springwater Corridor Trail from Three Bridges area to SE 82nd Ave.
U - Milwaukie Riverfront to Treatment Plant.

Added Projects

V - Sparrow & River Rd. - to connect to treatment plant trail.
W - "Big-picture" multi-jurisdictional coordination (e.g. regional bikeway system, etc.)
X - Trolley Trail design / planning / signage
Y - Bike Boulevards / Designated path location
Z - Railroad to International Way connection
AA - Intersection: International Way / Lake
AB - Intersection: Oak / 224

The participants then voted (10 stickers each this time, to reflect the greater number of projects), and a few items stood out well above the rest.

First off, the participants were overwhelmingly in favor of bike boulevards / designated bike paths. There was also a strong desire for improvements to the intersections of SE 17th with Hwy 224 and McLoughlin / SE Harrison. My issues with that second intersection require a post all to itself, which I'll try to put up in the next couple of days. Also given extra weight were projects V, W, and AB.

Other projects that the participants preferred were D, I, J, O, T and Z.

The remaining projects received 3 labels or less each, and projects C, R and S did not receive any votes.

Also discussed were the possibility of more exclusive multi-use paths, especially along the Willamette, and increasing connectivity by using alleyways / greenways between the "dead end" connectors in subdivisions. Milwaukie contains a number of hidden alleyways and accesses that are available to be utilized by bikes and pedestrians.

A couple of participants pointed to Portland's use of "dots" for directing bike traffic, and their new network of bicycle signage. Emily Gardner of the BTA (who was present as a meeting participant) expounded on this issue and others.

Due to the large number of issues raised during the meeting, and concern that all issues would be able to be addressed, it was determined that a third bike / ped workshop should be scheduled. Katie Mangle, Planning Director for the City of Milwaukie, also asked if the participants thought that the city needed a bicycle advisory committee, and a number of meeting participants thought that would be a great idea.

Further info coming when I have it.

------

After the meeting, I led a ride through a portion of Milwaukie to illustrate some of the issues present in the current transportation network. The ride included (among others) transportation diplomat Aaron Tarfman, Brett Kelver and Ryan Marquardt from the planning department, and Del Scharffenberg, a member of the Clackamas County Pedestrian / Bikeway Advisory Committee. We covered the major problem intersections along McLoughlin and SE 17th, the Three Bridges project, one of Milwaukie's "hidden" alleyways, and low and medium traffic residential and connector streets. I had planned a longer route, but misjudged the time required to cover all the locations I had planned.

Overall, the ride went well. It's difficult to understand the issues regarding Mcloughlin and the southern commute unless you actually ride it. Likewise, the problems with the SE 17th / McLoughlin / Harrison intersection are much more effectively communicated when you can witness them firsthand. I'm planning to do another 2-3 rides, each focusing on a different area of the city. We'll see how that goes.

Friday, April 27, 2007

Breakfast on the Bridge! Oh, and a ride!

Today's Stats:
Mileage: 12.68 miles
Top Speed: 29.1 mph
Average Speed: 13.7 mph (YAY)
Time in Saddle: 55 minutes, 36 seconds
Weight this Morning: 248 (Not so Yay)

Year-to-Date Stats:
Days: 117
Miles Ridden: 1,017.07 (an average of 8.69 miles per day)
Overall Average Speed: 10.7 mph
Top Speed: 35.8 mph (March 28th)
Fastest Average Speed To/From Work: 13.7 mph (today!) / 11.4 mph (Mar 21 / Apr 26)
Total Time in Saddle: 96 hours, 14 minutes
Goal Mileage, April 27th: 1,637 miles
2006 Mileage, April 27th: 1,060.81

Argh! I'm behind again! Not surprising, since I've been off the bike for two weeks! Not entirely by choice - my back wheel was totally hosed, and I was going to try to fix it myself, and loused it up. So, I begged Tomas to fix it for me, which he graciously did. So now it's rideable again, and the back wheel no longer makes those annoying spoke-popping and tensioning noises. Hopefully that means I won't lose any more spokes for a while. I mean, I'm replacing that wheel anyway, but probably not for another month or two.

Today I took a long, boring video with my digital camera, starting from my residence and going all the way to my bike locker downtown. I let it run the entire hour and 8 minutes - 55 minutes on the bike (plus a few minutes stopped at lights), and the whole 8-10 minutes I was at Breakfast on the Bridge today. I missed last month's, so it was good to stop by for a short bit.

I now have all the camping gear I need for Cycle Oregon, and now I just have a list of items I need to get for the bike - new cassette, new chain, brake pads, and bike clothing. I'm still stoked about going, and I really hope I can make it every day.

On the "activist" front, I've expressed my displeasure publicly to Mayor Tom Potter over his proposed budget, specifically the removal of funding for the Platinum Bicycle Master Plan Update. My email (comment #6) generated a couple of flattering comments on its own. I guess 8 years in the military and 10 years in the corporate world is worth something. I hope it helps. There were over 300 separate comments submitted to the Mayor's office, so one would think that they might look at that one again. I will be on the Master Plan Update Ride (#4) on Tuesday in North Portland, both to show my support and to learn more about conditions in that part of the city. I know a bit from previous rides, but I expect I'll learn things I had no clue about (just like on every other ride I've done in Portland). Also, I have another upcoming Milwaukie TSP Update meeting on Wednesday, and the 2nd (and final?) TSP Bike/Ped meeting on May 5th. I don't know what's happening with "Umbrella" at the moment - we're ready to work up our 1023 once we have the final info we need.

Well, that's it for now - back to work.

Tuesday, April 10, 2007

Yowza - I need to be biking!

Ok, still not getting out and about enough.

Currently averaging about 9 miles per day. This morning, I rode my standard 12.3 miles into work, in a little under 65 minutes. Average speed 11.4 mph, top speed 28.1 mph. The weather was nice, if a bit cold, and the ride is was smooth and easy for the most part.

Yesterday I got my tent, footprint and camp pad. Another (ouch) $300 spent. The good news is that this equipment will work fine for the various events I plan on doing this year. Yay! Reusable for a good number of years as long as I take care of the equipment.

The next Milwaukie TSP Update meeting (bike / ped workshop, that is) is coming up on May 5th at Milwaukie City Hall.

Tuesday, March 27, 2007

Milwaukie TSP Bike / Ped Meeting #1


The Milwaukie TSP (Transportation System Plan) Update Bicycle and Pedestrian Workshop meeting was held from 10am to 12pm, Saturday, March 24th at Milwaukie City Hall in the City Council chamber. Here is an overview of that meeting:

Katie Mangle, planning director for the City of Milwaukie, started off with an overview of the process. The bike/Ped workshop for the TSP update consists of two (possibly 3 if required) meetings. The first meeting (March 24th) is to identify current problem areas in the city, errors in the provided maps of bicycle facilities and pedestrian sidewalks, and areas for improvement. The second meeting (probably in late April, TBA) will list proposed solutions developed by City staff and DKS Associates, the transportation firm hired by the city to help them through the process.

Katie also presented the Draft TSP Goals:

  1. Balanced transportation system that provides travel choices
  2. Reduce length of trips; manage congestion
  3. Safety
  4. Enhance Milwaukie's livability
  5. Promote economic vitality
  6. Develop context-sensitive design standards
  7. Sustainability (environmental, economic, social)
  8. Coordinate with other jurisdictions & be consistent with the city's Comprehensive Plan
  9. Efficiently use available funds/monies to implement recommended projects

There were approximately 20 members of the public in attendance, who were nearly equally split between pedestrian and bike concerns. The group split into 2 working groups - I attended the bicycle portion. After 90 minutes of discussion, the two groups reassembled to summarize the information.

I delivered a list of map errors to Alan Snook, the transportation planner from DKS Associates who is working with the city. Overall, the map of existing bike facilities (bike lanes, shared lanes) was reasonably accurate, with some disagreement over the designation of north Linwood as "shared lane" and the omission of the relatively unknown multi-use path along the river behind the sewage treatment plant.

Brett Kelver, Assistant Planner for the city, facilitated. Brett is handling the bike side of things, and Ryan Marquardt (also Assistant Planner for the city) is focusing more on the pedestrian side.

Members of the public around the table took turns describing the bike issues currently in the city. The following items were discussed:

  • No signage for the trail behind the sewage plant- Bike lanes on lower Linwood poor quality pavement, full of debris
  • Curbs separating Linwood bike lanes prevent sweepers from cleaning the lanes
  • Crossings of Johnson Creek Blvd. are problematic and hazardous
  • Lake Road: one side is not bike-friendly
  • No good east-west connections in southern Milwaukie
  • Railroad Avenue totally unsuited for bikes, hazardous
  • The 1997 plan only addressed a few problems, most still exist
  • Lake at RR / Harmony / Linwood intersection: paint on bike lanes worn off
  • Upper Linwood does not have continuous paved shoulders
  • Storm drain at Linwood & King right in bike path on turn
  • Homeowner placing "For Sale" sign in the bike lane
  • Drivers not respecting bike lanes, parking in them, etc (esp. King / JCB / River Rd / Linwood)
  • No enforcement of bike lanes - PD needs to ticket more
  • SE 17th has lots of gravel & debris, bike lanes not continuous
  • SE 17th & McLoughlin: loop detectors not sensitive enough, bike lane outboard of right-turn lane
  • SE 17th & McLoughlin: sharp corner, cars drive into bike lane rather than taking it wide
  • SE 17th & McLoughlin: crosswalk button more than 10 feet from bike lane behind safety fence
  • SE 17th at 224: northbound cars off 224 do not stop
  • Springwater Trail - bumpy, debris, pothole in Tideman Park, bad surface quality
  • RR crossing at 21st & Adams dangerous, road surface bumpy
  • Stop sign lying on ground at Springwater and Precision Castparts Corp. parking lot driveway
  • Need better signage on Springwater Trail
  • Pedestrian ramp from 3 Bridges to McLoughlin poorly designed, sharp corners make bicycling dangerous
  • Need to coordinate with Portland for the areas that straddle the city / county line
  • JCB: If bike lane line worn off, cars veer into bike lane and crowd bikes out
  • Sellwood bridge (outside study area, but impacting the study area) needs bike issues addressed
  • Upper Lake Rd (east) has lots of debris
  • Need to repaint (restripe) bike lanes on Linwood, Harmony, King
  • Bike hit by car on JCB west of 42nd Avenue
  • Need more education and enforcement re: bike lanes
  • Low-speed, low-use roads better solution than bike lanes - people don't feel comfortable on King / Lake
  • Bike lanes are rarely clean and usually full of gravel and debris
  • River Rd descent problematic for bikes, especially those trying to turn left (west) into Island neighborhood
  • Need safe routes to schools, and between schools and parks
  • Concern over future Trolley Trail, and connections between it, Riverfront Park, and McLoughlin

There was also discussion about the good things in Milwaukie, mostly centered around the 3 Bridges project.

When the group reassembled, the bicycle and pedestrian points were summarized. There was little overlap between the two groups, and no stated major conflicts between them.

Kaite Mangle then outlined the process that was expected to happen over the next couple months. The planners will take the comments from this meeting, create a list of proposed solutions / projects for the city to incorporate into the TSP, and get public comment on them at the second meeting. After that meeting, there will be an open house in late spring / early summer for additional public comment, and then the main advisory committee for the project will take those recommendations and create a plan to submit to the Milwaukie City Council for final approval.